Commit Graph

27 Commits

Author SHA1 Message Date
Urtzi Alfaro
41d3998f53 Clean docs 2025-11-07 14:53:36 +01:00
ualsweb
547292c89e Merge pull request #13 from ualsweb/claude/jtbd-bakery-inventory-ui-011CUrU1eJcvQVUnNQZYh67L
Claude/jtbd bakery inventory UI 011 c ur u1e jcv qv un nqz yh67 l
2025-11-07 11:18:00 +01:00
Claude
376cdc73e1 Add proposal for inventory lots with expiration tracking in onboarding
Created comprehensive proposal document analyzing how to add product lots with
expiration dates to the InventorySetupStep during onboarding.

Key recommendations:
- Use inline stock entry approach after each ingredient
- Support multiple lots per ingredient with different expiration dates
- Include smart features: auto-suggest expiration, validation warnings
- Phase 1 MVP: basic lot entry with quantity, expiration, supplier
- Phase 2: Multi-lot support
- Phase 3: Smart features and auto-suggestions

Document includes:
- Current state analysis of inventory system
- JTBD alignment with detailed references
- 3 detailed UI/UX options with mockups
- Implementation recommendations with code examples
- Success metrics and risk mitigation
- 4-phase rollout plan

This addresses critical gap where users complete onboarding with zero
actual stock in system, preventing immediate value from FIFO, expiration
alerts, and waste prevention features.
2025-11-06 20:02:03 +00:00
Urtzi Alfaro
813e8866ef Add readme files 2025-11-06 14:10:04 +01:00
Claude
5ec2feb3bb Add comprehensive wizard flow specification for bakery inventory setup UI
Created a detailed design specification for the post-onboarding setup wizard
that guides users through adding suppliers, inventory, recipes, quality checks,
and team members.

Key features of the specification:

**Wizard Structure (7 Steps)**:
- Step 5: Welcome & Setup Overview
- Step 6: Add Suppliers (≥1 required)
- Step 7: Set Up Inventory Items (≥3 required)
- Step 8: Create Recipes (≥1 required)
- Step 9: Define Quality Standards (≥2 required)
- Step 10: Add Team Members (optional)
- Step 11: Review & Launch

**Design Principles**:
- Guide, don't block (flexible but directed)
- Explain, don't assume (plain language, contextual help)
- Validate early, fail friendly (real-time validation)
- Progress over perfection (good enough to move forward)
- Show value early (unlock features as you progress)

**Smart Features**:
1. Intelligent templates (starter inventory, recipe templates, quality checks)
2. Auto-suggestions & smart defaults (ML-powered category detection)
3. Bulk import & export (CSV/Excel support)
4. Contextual help system (tooltips, video tutorials, inline examples)
5. Progress celebrations & motivation (milestone animations)
6. Intelligent validation warnings (non-blocking soft warnings)

**Technical Implementation**:
- Component architecture and file structure
- Reusing OnboardingWizard and AddModal patterns
- Backend API requirements (bulk endpoints, templates, smart suggestions)
- State management approach
- Performance considerations (lazy loading, caching, optimistic updates)
- Accessibility and internationalization support

**Progress Tracking**:
- Weighted progress calculation (by step complexity)
- Save & resume functionality
- Mobile and desktop navigation patterns
- Auto-save behavior

**Validation & Error Handling**:
- Field-level, cross-field, and step-level validation
- Helpful error messages (not technical jargon)
- Dependency enforcement (suppliers → inventory → recipes)
- Error recovery strategies

**Success Metrics**:
- Leading: Completion rate (≥80%), time to complete (15-25 min), data quality (≥90%)
- Lagging: Feature adoption (≥70%), NPS (≥40), time to first value (≤3 days)
- Business impact: Waste reduction (15-20%), cost visibility (100%), quality compliance (≥80%)

**Implementation Roadmap**:
- Phase 1: Foundation (Week 1-2)
- Phase 2: Core Steps (Week 3-5)
- Phase 3: Advanced Features (Week 6-7)
- Phase 4: Polish & Smart Features (Week 8)
- Phase 5: Testing & Iteration (Week 9-10)
- Phase 6: Launch & Monitor (Week 11+)

Estimated completion time: 15-20 minutes for users
Target completion rate: ≥80%

Based on JTBD analysis in docs/jtbd-analysis-inventory-setup.md
2025-11-06 10:51:59 +00:00
Claude
9fe759f856 Add comprehensive JTBD analysis for post-onboarding inventory setup
Conducted a thorough Jobs To Be Done analysis for the bakery inventory
setup experience after registration and onboarding. The analysis includes:

- Primary functional job and success criteria
- Emotional and social jobs (confidence, control, competence)
- 4-phase sub-job breakdown (Understanding → Dependencies → Operations → Verification)
- Forces of progress analysis (push, pull, anxiety, habit)
- 6 major barrier categories with code evidence
- 10 prioritized unmet needs
- Recommended solution approach: Guided Bakery Setup Journey
- Success metrics (leading and lagging indicators)

Key findings:
- Users face discovery, cognitive load, and navigation barriers
- No post-onboarding guidance (wizard ends, users are on their own)
- Dependency management not enforced (can create recipes without ingredients)
- Inconsistent modal patterns across different entity types
- No progress tracking or completion indicators

Target user: Bakery owner/employee with limited time and basic computer skills

Recommended approach: Transform scattered modal-based entry into a
continuous guided journey that continues from the onboarding wizard.
2025-11-06 10:24:48 +00:00
Urtzi Alfaro
3007bde05b Improve kubernetes for prod 2025-11-06 11:04:50 +01:00
Urtzi Alfaro
394ad3aea4 Improve AI logic 2025-11-05 13:34:56 +01:00
Urtzi Alfaro
5c87fbcf48 Improve the frontend 6 2025-11-02 20:26:25 +01:00
Urtzi Alfaro
0220da1725 Improve the frontend 4 2025-11-01 21:35:03 +01:00
Urtzi Alfaro
61376b7a9f Improve the frontend and fix TODOs 2025-10-24 13:05:04 +02:00
Urtzi Alfaro
07c33fa578 Improve the frontend and repository layer 2025-10-23 07:44:54 +02:00
Urtzi Alfaro
05da20357d Improve teh securty of teh DB 2025-10-19 19:22:37 +02:00
Urtzi Alfaro
d4060962e4 Improve demo seed 2025-10-17 07:31:14 +02:00
Urtzi Alfaro
b6cb800758 Improve GDPR implementation 2025-10-16 07:28:04 +02:00
Urtzi Alfaro
8f9e9a7edc Add role-based filtering and imporve code 2025-10-15 16:12:49 +02:00
Urtzi Alfaro
7556a00db7 Improve the demo feature of the project 2025-10-12 18:47:33 +02:00
Urtzi Alfaro
b420af32c5 REFACTOR production scheduler 2025-10-09 18:01:24 +02:00
Urtzi Alfaro
7cc4b957a5 Fix DB issue 2s 2025-09-30 21:58:10 +02:00
Urtzi Alfaro
ec6bcb4c7d Add migration services 2025-09-30 08:12:45 +02:00
Urtzi Alfaro
221781731c Fix frontend 3 2025-08-28 23:40:44 +02:00
Urtzi Alfaro
9c247a5f99 Add readme 2025-08-24 09:22:12 +02:00
Urtzi Alfaro
c6dd6fd1de Add more services 2025-08-21 20:28:14 +02:00
Urtzi Alfaro
399ba80067 Fix new services implementation 7 2025-08-15 22:40:19 +02:00
Urtzi Alfaro
277b1332cb Fix new services implementation 6 2025-08-15 18:09:35 +02:00
Urtzi Alfaro
16b8a9d50c Create new services: inventory, recipes, suppliers 2025-08-13 17:39:35 +02:00
Urtzi Alfaro
312fdc8ef3 Improve the traffic fetching system 2025-08-08 23:29:48 +02:00