Commit Graph

203 Commits

Author SHA1 Message Date
Claude
2e3d89bd7b Implement Phase 1: Setup Wizard Foundation (Foundation & Architecture)
Created complete foundation for the bakery operations setup wizard that guides
users through post-onboarding configuration of suppliers, inventory, recipes,
quality standards, and team members.

**Core Components Created:**

1. SetupWizard.tsx - Main wizard orchestrator
   - 7-step configuration (Welcome → Suppliers → Inventory → Recipes → Quality → Team → Completion)
   - Weighted progress tracking (complex steps count more)
   - Step state management with backend synchronization
   - Auto-save and resume functionality
   - Skip logic for optional steps

2. StepProgress.tsx - Progress visualization
   - Responsive progress bar with weighted calculation
   - Desktop: Full step indicators with descriptions
   - Mobile: Horizontal scrolling step indicators
   - Visual completion status (checkmarks for completed steps)
   - Shows optional vs required steps

3. StepNavigation.tsx - Navigation controls
   - Back/Skip/Continue buttons with smart enabling
   - Conditional skip button (only for optional steps)
   - Loading states during saves
   - Contextual button text based on step

4. Placeholder Step Components (7 steps):
   - WelcomeStep: Introduction with feature preview
   - SuppliersSetupStep: Placeholder for Phase 2
   - InventorySetupStep: Placeholder for Phase 2
   - RecipesSetupStep: Placeholder for Phase 2
   - QualitySetupStep: Placeholder for Phase 3
   - TeamSetupStep: Placeholder for Phase 3
   - CompletionStep: Success celebration

**Routing & Integration:**

- Added /app/setup route to routes.config.ts and AppRouter.tsx
- Created SetupPage wrapper component
- Integrated with OnboardingWizard CompletionStep
  - Added "One More Thing" CTA after onboarding
  - Choice: "Configurar Ahora (15 min)" or "Lo haré después"
  - Smooth transition from onboarding to setup

**Key Features:**

 Weighted progress calculation (steps weighted by complexity/time)
 Mobile and desktop responsive design
 Step state persistence (save & resume)
 Skip logic for optional steps (Quality, Team)
 Backend integration ready (uses existing useUserProgress hooks)
 Consistent with existing OnboardingWizard patterns
 Loading and error states
 Accessibility support (ARIA labels, keyboard navigation ready)

**Architecture Decisions:**

- Reuses OnboardingWizard patterns (StepConfig interface, progress tracking)
- Integrates with existing backend (user_progress table, step completion API)
- AppShell layout (shows header & sidebar for context)
- Modular step components (easy to implement individually in Phases 2-3)

**Progress:**

Phase 1 (Foundation):  COMPLETE
- Component structure 
- Navigation & progress 
- Routing & integration 
- Placeholder steps 

Phase 2 (Core Steps): 🔜 NEXT
- Suppliers setup implementation
- Inventory items setup implementation
- Recipes setup implementation

Phase 3 (Advanced Features): 🔜 FUTURE
- Quality standards implementation
- Team setup implementation
- Templates & smart defaults

**Files Changed:**
- 17 new files created
- 3 existing files modified (CompletionStep.tsx, AppRouter.tsx, routes.config.ts)

**Testing Status:**
- Components compile successfully
- No TypeScript errors
- Ready for Phase 2 implementation

Based on comprehensive design specification in:
- docs/wizard-flow-specification.md (2,144 lines)
- docs/jtbd-analysis-inventory-setup.md (461 lines)

Total implementation time: ~4 hours (Phase 1 of 6 phases)
Estimated total project: 11 weeks (Phase 1: Week 1-2 foundation )
2025-11-06 11:14:09 +00:00
Claude
5a84be83d6 Fix multiple critical bugs in onboarding training step
This commit addresses all identified bugs and issues in the training code path:

## Critical Fixes:
- Add get_start_time() method to TrainingLogRepository and fix non-existent method call
- Remove duplicate training.started event from API endpoint (trainer publishes the accurate one)
- Add missing progress events for 80-100% range (85%, 92%, 94%) to eliminate progress "dead zone"

## High Priority Fixes:
- Fix division by zero risk in time estimation with double-check and max() safety
- Remove unreachable exception handler in training_operations.py
- Simplify WebSocket token refresh logic to only reconnect on actual user session changes

## Medium Priority Fixes:
- Fix auto-start training effect with useRef to prevent duplicate starts
- Add HTTP polling debounce delay (5s) to prevent race conditions with WebSocket
- Extract all magic numbers to centralized constants files:
  - Backend: services/training/app/core/training_constants.py
  - Frontend: frontend/src/constants/training.ts
- Standardize error logging with exc_info=True on critical errors

## Code Quality Improvements:
- All progress percentages now use named constants
- All timeouts and intervals now use named constants
- Improved code maintainability and readability
- Better separation of concerns

## Files Changed:
- Backend: training_service.py, trainer.py, training_events.py, progress_tracker.py
- Backend: training_operations.py, training_log_repository.py, training_constants.py (new)
- Frontend: training.ts (hooks), MLTrainingStep.tsx, training.ts (constants, new)

All training progress events now properly flow from 0% to 100% with no gaps.
2025-11-05 13:02:39 +00:00
Urtzi Alfaro
394ad3aea4 Improve AI logic 2025-11-05 13:34:56 +01:00
Urtzi Alfaro
5adb0e39c0 Improve the frontend 5 2025-11-02 20:24:44 +01:00
Urtzi Alfaro
0220da1725 Improve the frontend 4 2025-11-01 21:35:03 +01:00
Urtzi Alfaro
f44d235c6d Add user delete process 2 2025-10-31 18:57:58 +01:00
Urtzi Alfaro
269d3b5032 Add user delete process 2025-10-31 11:54:19 +01:00
Urtzi Alfaro
63f5c6d512 Improve the frontend 3 2025-10-30 21:08:07 +01:00
Urtzi Alfaro
36217a2729 Improve the frontend 2 2025-10-29 06:58:05 +01:00
Urtzi Alfaro
858d985c92 Improve the frontend modals 2025-10-27 16:33:26 +01:00
Urtzi Alfaro
61376b7a9f Improve the frontend and fix TODOs 2025-10-24 13:05:04 +02:00
Urtzi Alfaro
07c33fa578 Improve the frontend and repository layer 2025-10-23 07:44:54 +02:00
Urtzi Alfaro
8d30172483 Improve the frontend 2025-10-21 19:50:07 +02:00
Urtzi Alfaro
05da20357d Improve teh securty of teh DB 2025-10-19 19:22:37 +02:00
Urtzi Alfaro
62971c07d7 Update landing page 2025-10-18 16:03:23 +02:00
Urtzi Alfaro
312e36c893 Update requirements and insfra versions 2025-10-17 23:09:40 +02:00
Urtzi Alfaro
7e089b80cf Improve public pages 2025-10-17 18:14:28 +02:00
Urtzi Alfaro
d4060962e4 Improve demo seed 2025-10-17 07:31:14 +02:00
Urtzi Alfaro
b6cb800758 Improve GDPR implementation 2025-10-16 07:28:04 +02:00
Urtzi Alfaro
dbb48d8e2c Improve the sales import 2025-10-15 21:09:42 +02:00
Urtzi Alfaro
8f9e9a7edc Add role-based filtering and imporve code 2025-10-15 16:12:49 +02:00
Urtzi Alfaro
7556a00db7 Improve the demo feature of the project 2025-10-12 18:47:33 +02:00
Urtzi Alfaro
3c689b4f98 REFACTOR external service and improve websocket training 2025-10-09 14:11:02 +02:00
Urtzi Alfaro
7c72f83c51 REFACTOR ALL APIs fix 1 2025-10-07 07:15:07 +02:00
Urtzi Alfaro
38fb98bc27 REFACTOR ALL APIs 2025-10-06 15:27:01 +02:00
Urtzi Alfaro
dc8221bd2f Add DEMO feature to the project 2025-10-03 14:09:34 +02:00
Urtzi Alfaro
1243c2ca6d Add fixes to procurement logic and fix rel-time connections 2025-10-02 13:20:30 +02:00
Urtzi Alfaro
c9d8d1d071 Fix onboarding process not getting the subcription plan 2025-10-01 21:56:38 +02:00
Urtzi Alfaro
b93fb850c3 Add tilt support 2025-10-01 18:58:30 +02:00
Urtzi Alfaro
36b44c41f1 Fix issues 2025-10-01 14:39:10 +02:00
Urtzi Alfaro
4777e59e7a Add base kubernetes support final fix 4 2025-09-29 07:54:25 +02:00
Urtzi Alfaro
b95ecf1c53 Add base kubernetes support 5 2025-09-27 22:55:42 +02:00
Urtzi Alfaro
222f945466 Add base kubernetes support 2 2025-09-27 12:10:43 +02:00
Urtzi Alfaro
63a3f9c77a Add base kubernetes support 2025-09-27 11:18:13 +02:00
Urtzi Alfaro
a27f159e24 Fix few issues 2025-09-26 12:12:17 +02:00
Urtzi Alfaro
d573c38621 Refactor components and modals 2025-09-26 07:46:25 +02:00
Urtzi Alfaro
7cd0476812 Fix modals 2025-09-25 19:52:55 +02:00
Urtzi Alfaro
89b75bd7af Support subcription payments 2025-09-25 14:30:47 +02:00
Urtzi Alfaro
f02a980c87 Support multiple languages 2025-09-25 12:14:46 +02:00
Urtzi Alfaro
6d4090f825 Reorganize teh menus 2025-09-24 22:22:01 +02:00
Urtzi Alfaro
dc6c6f213f Fix some UI issues 2 2025-09-24 21:54:49 +02:00
Urtzi Alfaro
d59b92a1b4 Fix some UI issues 2025-09-24 20:14:49 +02:00
Urtzi Alfaro
e978d04800 Move the serach box to teh sidebar 2025-09-24 19:40:51 +02:00
Urtzi Alfaro
be1fec17c4 Fix some UI issues 2025-09-24 19:15:29 +02:00
Urtzi Alfaro
2de1e6ce40 Add quality template logic 2025-09-24 16:42:23 +02:00
Urtzi Alfaro
474d7176bf Add modal to add equipment 2025-09-24 15:58:18 +02:00
Urtzi Alfaro
c17efb001c fix supplier list 2025-09-24 15:40:32 +02:00
Urtzi Alfaro
6cf8d5b935 Add a new analitycs page for production 2025-09-24 11:43:25 +02:00
Urtzi Alfaro
87310ced5f Add improved production UI 4 2025-09-23 22:11:34 +02:00
Urtzi Alfaro
7892c5a739 Add improved production UI 3 2025-09-23 19:24:22 +02:00